Projects

Project:
Type:
Address:
ECOTERRA’s SOW:
ECOTERRA’s Services:

20 Story Condominium Tower
Mixed-use Retail/Residential Tower
21St Street, New York, NY
Management of 7,800 + Tons of Contaminated Soils
Transporation & Disposal, Disposal Facility Selections, and Waste Characterization Consulting

p1
p2

Assisted in development of Waste Characterization sampling plan to isolate the PCE “Hot Spot”.

Developed Hybrid Sample Collection & Analysis chart good for Subtitle-D Landfill and recycling/beneficial reuse facility.

Provided sampling oversight and guidance.

Established horizontal and vertical delineation, Isolated contamination that was a key factor to save money.

Lightly PCE Impacted soils were beneficially reused as “alternative daily cover” at Subtitle-D Landfill;
rather than disposing as Solid Waste. Huge savings for customer. Zero waste to Landfills.

Other contaminated fill material was recycled/beneficially used to maximize the savings for customer.

Assisted with all waste profiles; secured facility approvals.

Provided onsite personnel to manage the daily waste management.

Summary:

7,800+ Tons Beneficially Reused
Huge savings to the customer by minimizing the PCE impacted soils volume
No load rejections; no surcharges;
Easy facility approvals; no additional analysis requirements

Project:
Type:
Address:
ECOTERRA’s SOW:
ECOTERRA’s Services:

Reconstruction of Combined Sewer System
State/City Agency Funded Infrastructure Improvement Project
Paterson, New Jersey
Management of 11,000 + Tons of Contaminated Soils
Transporation & Disposal, Disposal Facility Selections, and Waste Characterization Consulting

p4

“Provided sampling oversight and guidance.”

Identified/Delineated former UST area; minimizing soils being handled as petroleum contaminated

Utilized multiple disposal facilities as per waste characterization results, soil matrix to maximize the savings for customer

Assisted with all waste profiles; secured facility approvals

Provided onsite personnel to manage the daily waste management

Managed upto 60 truck loads a day

Staggered trucking schedule was implemented to minimize the traffic impact

Summary:

11,000+ Tons Beneficially Reused
Huge savings to the customer by minimizing the Petroleum impacted soils volume
No load rejections; no surcharges;
Easy facility approvals; no additional analysis requirements
ECOTERRA’s MBE status helped customer meet set-aside goal for this project

Project:
Type:
Address:
ECOTERRA’s SOW:
ECOTERRA’s Services:

Redevelopment of Community Center/Temple
Non-profit organization
Edison, New Jersey
Locate “Borrow” sites to reuse 30,000++ CY of excess material as Structural Fill
Environmental/LSRP Services

p5

Identified “Borrow” site(s) which can use this clean material as Structural Fill for their project needs

Provided LSRP Services to manage the necessary documentation requirement set forth by “Borrow” site(s)
before accepting the material

Provided sampling oversight and guidance

Provided onsite personnel to manage the daily material hauling activity

Managed upto 150 truck loads a day

Staggered trucking schedule was implemented to minimize the traffic impact

Summary:

30,000+ CY Reused as “Structural Fill”
$1M + direct savings to the customer
Traditionally, this material would have been disposed-off site at a cost but ECOTERRA was instrumental
in securing “Borrow” site(s) which accepted this material without charge;
Moreover, Material was picked-up by the “Borrow” site(s) from the project site